
AIBMTO
Location
Bengaluru
Client
Bengaluru Airport City Limited
Site Area
1 acre
Builtup Area
90,000 sft
Year
2024 - 2026
Status
Completed
AIBMTO is a 1-acre, 90,000-sq-ft institutional facility developed for Bengaluru Airport City Limited between 2024 and 2026, now completed. As part of the practice's broader BACL relationship (alongside BP02 and BACL Business Park), the project delivers a specialised airport-linked facility — likely a training, operations, or aviation-support institution — requiring functional planning suited to aviation-sector operational and possibly regulatory requirements. The design strategy would prioritise clear circulation between administrative, training, and operational zones, robust security and access control appropriate to an airport-adjacent facility, and infrastructure capable of supporting specialised aviation-related equipment or activity. Completed within a two-year timeframe, the project reflects the practice's capability delivering purpose-built institutional infrastructure within Bengaluru's airport city ecosystem, complementing its commercial-sector work for the same client with a facility supporting the sector's operational and training needs.
